 |
|
|
 |
 |
| |
Lockheed Martin |
| |
Digital Optronics |
| |
Center for
Intelligent Machines and Robotics |
| |
Honeywell,
Inc. |
| |
Chastain-Skillman,
Inc. |
| |
|
|
|
 |
| |
|
|
| Timeframe: |
December 2003 - Present |
| Position
Title: |
Systems
Engineer Sr. |
| Organization: |
- Integrated Systems
and Solutions (IS&S)

Remote Sensing Systems Integration (RSSI)
  
Spectral Exploitation Project (SEP)

|
| Responsibilities: |
Currently working as a systems
engineer on a government funded contract. Working closely with a senior
engineer on development and evaluation of image processing algorithms.
Typical development cycles include: formulation, prototyping, revision,
and coding into a simulation environment. |
|
| |
|
|
|
 |
| |
|
|
|
|
|
|
 |
| |
|
|
| Timeframe: |
January
2000 - May 2003 |
| Position
Title: |
Research
Assistant |
| Responsibilities: |
Worked
as a graduate student on cooperative design projects centered on autonomous
vehicles. Work included: programming Windows, Linux, and microcontroller
systems, designing and prototyping mechanical objects. Research project
entailed the conception and creation of a visual, monocular-based
vehicle position system. |
|
|
|
|
|
|
 |
| |
|
|
| Timeframe: |
May
1998 - May 1999 |
| Position
Title: |
Mechanical
Engineer Co-op |
| Responsibilities: |
Worked
full-time as a mechanical engineering co-op in the field of guidance
and navigation. Performed diverse tasks including hardware design,
development of metrics automation software, and writing engineering
orders. Involved with daily and weekly meetings with other engineers
and clients. Simultaneously worked with multiple departments including,
mechanical, electrical, procurement, quality assurance, and various
testing labs. |
|
|
|
|
|
|
 |
| |
|
|
| Timeframe: |
May
1997 - June 1999 |
| Position
Title: |
Head
Drafting Technician |
| Responsibilities: |
Worked
as the head drafting technician for the Tampa office specializing
in AutoCAD. Completed time sensitive projects for multiple industrial
hygienists and engineers, concurrently. Projects included drafting
floor plans, site plans, etc. for displaying asbestos sample locations,
indoor air quality evaluations, HVAC designs, and so on. |
|
 |